Sign in Send drawings
BOQ
drafting service

Draft BOQ in 30 seconds. Engineer-checked in 2 working days.

BOQ αž–αŸ’αžšαžΆαž„αž€αŸ’αž“αž»αž„ ៣០ αžœαž·αž“αžΆαž‘αžΈαŸ” αžαŸ’αžšαž½αžαž–αž·αž“αž·αžαŸ’αž™αžŠαŸ„αž™αžœαž·αžŸαŸ’αžœαž€αžšαž€αŸ’αž“αž»αž„ ្ αžαŸ’αž„αŸƒαž’αŸ’αžœαžΎαž€αžΆαžšαŸ”

Simple drawings get a draft BOQ in under 30 seconds in the web app. Full tender sets come back as a priced BOQ in Excel and PDF, checked by a Licensed PE (Cambodia), in 2 working days.

Draft in under 30 seconds Β· Checked in 2 working days Β· Excel + PDF Β· English and Khmer

What you receive

Priced BOQExcel with formulas intact, and PDF on letterhead.
RFI and assumptions listWhat the drawings do not show.
Checked by a Licensed PEConfidence grade A, B or C on every line.
In the app

A draft BOQ you can check line by line

01

Draft takeoff

Select a region of the plan. Get the quantities behind it.

Every item shows its formula, measurement method, source drawing and assumption.

02

Cambodia rate library

Source and date on every rate; old rates flagged.

Filter by trade, source, approval and price date.

03

QS approval gate

An estimator drafts; only a reviewer approves.

Approval is refused while a BOQ is empty, and every unapproved rate is named.

04

Exports

CSV, PDF, Excel and Word.

Every file is marked Draft BOQ: QS review required, and the totals reconcile to the cent.

Beyond the takeoff

Pricing the job is one week. Running it is the other fifty-one.

Every module loads as you scroll, like the site office switching on at six in the morning.

Illustrative figures from the demonstration workspace Β· Try it: tap a task, a milestone or a project

Plan jobs Β· Schedule
WK1WK4WK7WK10WK14
Site set-out
Substructure
Frame
Roof
MEP rough-in
Finishes
Handover
On trackCriticalDone
Win work Β· Pipeline6 leads
New inquiry2 Β· $185,000
Qualified2 Β· $493,500
Site visit1 Β· $64,000
Estimate sent1 Β· $186,500
Open pipeline$929,000

1 follow-up overdue

Plan jobs Β· Today on site
  • 07:00
    Rebar delivery to grid CWaiting on the supplier
  • 08:30
    Formwork, ground beamsGang of six
  • 10:00
    Concrete pour, columns L1Pump booked
  • 15:00
    Site visit reportSent to the client
+ 8 more tasks this week
Plan jobs Β· Milestones
Substructure4/4
Frame2/5
Roof0/3
Counted from the tasks underneath, not typed in
Open pipeline$929,0006 leads Β· 1 follow-up overdue
Outstanding$5,5201 invoice overdue
Protect margin Β· Cost to completeUpdated with each cost
Budget (accepted estimate)$186,500
Approved costs$72,400
Pending approval$9,800
Remaining$114,100

Pending costs are shown, not counted, until someone approves them.

Get paid Β· Invoices
Invoiced$16,560Received$11,040Outstanding$5,520Overdue1
Part payments recorded against each invoice
Now open

Sidoku QS app

Upload drawings, get a draft BOQ in minutes, every line traced to the drawing. Every line stays a draft until a reviewer approves it.

  • Draft takeoff
  • Cambodia rate library
  • QS approval gate
sidokuqs.com/app Β· project workspace
Sidoku QS

S-101 Β· Ground floor plan

Demonstration project Β· Scale 1:100

0 items found

ABC 1234 12.00 m 8.00 m 4.004.00 S-101GROUND FLOOR PLANSCALE 1:100SIDOKU QS Β· DEMO

    Tap an item to see where it was measured.

    Sidoku QS app Β· demonstration

    Why a checked BOQ

    What it costs to bid without one.

    Published research, with the source on every card. Tap a card to see it.

    Your bid

    US$ 15,000

    lost on one bid, from quantity errors

    That is 38% of your US$ 40,000 margin. The client does not pay for missed quantities. You do.

    How Sidoku helps: every line is measured from the drawing and checked by a Licensed PE before you price it.

    Cost

    0%

    of projects came within 10% of budget

    Only 31% of projects in the past three years finished within 10% of their budget.

    How Sidoku helps: every rate shows its source and date; rates older than 90 days are re-checked.

    Schedule

    0 in 4

    projects finished within 10% of their deadline

    Only a quarter of projects finished within 10% of their original deadline.

    How Sidoku helps: a priced BOQ in 2 working days, so the estimate never holds up the bid.

    Cost Β· Schedule

    0%

    over budget, on large projects

    Large projects typically take 20% longer than scheduled and can run up to 80% over budget.

    How Sidoku helps: an RFI list of what the drawings do not show, before you commit to a number.

    Take-off

    0%

    of rework comes from poor data

    Miscommunication and poor project data cause 48% of all rework on US jobsites.

    How Sidoku helps: every quantity is linked to the drawing region it was measured from.

    Take-off

    0 hours

    a week, per person, lost to rework and searching

    Each project team member spends over 14 hours a week on conflict, rework and looking for project data.

    How Sidoku helps: one record from drawing to BOQ, so nobody re-types or hunts for numbers.

    Take-off

    Top 0

    cause of cost overrun: inaccurate estimating

    On high-rise projects in Indonesia, inaccurate material estimating was one of the three main causes of cost overrun.

    How Sidoku helps: Checked and signed by a Licensed PE

    Cambodia

    0%

    of poor cost performance traced to cost management

    In Cambodian residential building projects, project and cost management explained 53% of the variance in poor cost performance.

    How Sidoku helps: cost management that starts from a measured, priced BOQ.

    The Sidoku answer

    Every risk above, closed before you price.

    Contractors

    Price more tenders without more staff.

    • A priced BOQ in 2 working days, so you bid on time
    • An RFI list to price the unknowns, not guess them
    • Your number never reaches a competitor
    Send drawings

    Design consultants

    Add a BOQ to your design package, under your own name.

    • White label BOQ in Excel, formulas intact
    • Measured to RICS NRM2 or CESMM4
    • One round of corrections included
    Send drawings

    Owners, developers, NGOs

    Know the fair price before you tender.

    • A pre-tender BOQ to set your budget
    • Check contractor bids line by line
    • Excel and PDF your board or donor can read
    Send drawings
    Without Sidoku
    • 3 days measuring, 2 days chasing rates
    • Quantities nobody can trace
    • Rates with no source or date
    • Missing items found after you sign
    With Sidoku
    • Draft in 30 seconds, checked in 2 working days
    • Every line traced to the drawing
    • Every rate with its source and date
    • An RFI list before you price

    Six answers, built into every BOQ

    • Traced to the drawingAnswers 48% of rework
    • Checked by a Licensed PEAnswers the top 3 overrun cause
    • Rates with a dateAnswers: only 31% within budget
    • 2 working daysAnswers: only 1 in 4 on time
    • RFI list firstAnswers: up to 80% over budget
    • Your number stays yoursAnswers: who sees your price
    How it works

    From drawing to engineer-checked BOQ

    Pricing

    Order a BOQ, or run your own takeoffs in the app.

    Every BOQ is checked by a Licensed PE (Cambodia). Fixed quote before work starts.

    Also included: one round of corrections within 7 days of delivery.

    Available now

    Per BOQ

    Fixed quote
    per BOQ

    Pay job by job. Quote before work starts.

    Become our partner

    Includes

    • Priced BOQ in Excel and PDF
    • Checked and signed by a Licensed PE
    • RFI list and confidence grade on every line
    • 2 working days, up to 15 sheets
    Available now

    Free

    $0
    forever

    Try it on one small job a month.

    Start free

    Includes

    • 1 small job a month
    • Draft watermark on every page
    • View only, no Excel export
    • Basic rate library
    Available now

    Pro

    $49
    per month

    For owner-estimators pricing 2 to 3 tenders a month.

    Subscribe

    Everything in Free, plus

    • 25 credits a month
    • Unused credits roll over 1 month
    • AI-assisted drawing extraction
    • Full Cambodia rate library with source and date
    • Exports to Excel, PDF and Word
    Available now

    Team

    $129
    per month

    For firms with 5 to 50 staff.

    Subscribe

    Everything in Pro, plus

    • 3 seats and 80 credits a month
    • Extra seat $25 a month
    • Shared rate library and project workspace
    • Approval workflow: estimators draft, reviewers approve
    • Supplier and rate records
    • Audit trail of every change
    What you getPer BOQFreeProTeam
    Your BOQ
    Priced BOQ in Excel and PDFView only
    Checked and signed by a Licensed PE–––
    Every quantity traced to the drawing
    Assumptions and confidence grade on every line
    RFI list of what the drawings do not show–––
    Cambodia rate library with source and dateBasic
    Speed and help
    Turnaround2 working daysInstant draftInstant draftInstant draft
    AI-assisted drawing reading–
    Corrections1 round within 7 days–––
    Your team
    Credits a monthQuoted per job1 small job2580
    Seats–113, extra $25 a month
    Approval workflow: estimators draft, reviewers approve–––
    Supplier and rate records–––
    Audit trail of every change–––
    Pay by ABA transfer or KHQR–

    From message to BOQ

    1. Message usDrawings or the plan you want
    2. Fixed quoteBy sheets, scope and format
    3. PayABA transfer or KHQR
    4. StartBOQ in 2 working days, or your plan switched on
    • 1 credit = 1 CAD sheet or 20 text pages
    • Top-up: 20 credits for $30, valid 90 days
    • USD, excl. 10% VAT
    Trust

    Your number never reaches a competitor

    Firewall

    Sidoku QS does not bid tenders. Your drawings and prices stay with your reviewer. If our sister company is bidding the same tender, we decline the job, so your number is never seen by a competitor.

    Sidoku QS αž˜αž·αž“αž…αžΌαž›αžšαž½αž˜αžŠαŸαž‰αžαŸ’αž›αŸƒαž‘αŸαŸ” αž”αŸ’αž›αž„αŸ‹ αž“αž·αž„αžαž˜αŸ’αž›αŸƒαžšαž”αžŸαŸ‹αž’αŸ’αž“αž€ αžαŸ’αžšαžΌαžœαž”αžΆαž“αžšαž€αŸ’αžŸαžΆαž‘αž»αž€αžαŸ‚αž‡αžΆαž˜αž½αž™αž’αŸ’αž“αž€αžαŸ’αžšαž½αžαž–αž·αž“αž·αžαŸ’αž™αž”αŸ‰αž»αžŽαŸ’αžŽαŸ„αŸ‡αŸ” αž”αŸ’αžšαžŸαž·αž“αž”αžΎαž€αŸ’αžšαž»αž˜αž αŸŠαž»αž“αž”αž„αž”αŸ’αž’αžΌαž“αžšαž”αžŸαŸ‹αž™αžΎαž„ αžŠαŸαž‰αžαŸ’αž›αŸƒαž‚αž˜αŸ’αžšαŸ„αž„αžŠαžΌαž…αž‚αŸ’αž“αžΆ αž™αžΎαž„αž“αžΉαž„αž”αžŠαž·αžŸαŸαž’αž€αžΆαžšαž„αžΆαžšαž“αŸ„αŸ‡ αžŠαžΎαž˜αŸ’αž”αžΈαž€αž»αŸ†αž±αŸ’αž™αžαž˜αŸ’αž›αŸƒαžšαž”αžŸαŸ‹αž’αŸ’αž“αž€αž’αŸ’αž›αžΆαž€αŸ‹αž‘αŸ…αžŠαž›αŸ‹αžŠαŸƒαž‚αžΌαž”αŸ’αžšαž€αž½αžαž”αŸ’αžšαž‡αŸ‚αž„αŸ”

    Your data

    Your drawings stay with your reviewer and are deleted 90 days after delivery. Payment runs on ABA; we never see your card or bank details. NDA on request before you send anything.

    αž”αŸ’αž›αž„αŸ‹αžšαž”αžŸαŸ‹αž’αŸ’αž“αž€ αžαŸ’αžšαžΌαžœαž”αžΆαž“αžšαž€αŸ’αžŸαžΆαž‘αž»αž€αžαŸ‚αž‡αžΆαž˜αž½αž™αž’αŸ’αž“αž€αžαŸ’αžšαž½αžαž–αž·αž“αž·αžαŸ’αž™ αž αžΎαž™αž›αž»αž”αž…αŸ„αž›αž€αŸ’αžšαŸ„αž™αž€αžΆαžšαž”αŸ’αžšαž‚αž›αŸ‹ ៩០ αžαŸ’αž„αŸƒαŸ” αž€αžΆαžšαž”αž„αŸ‹αž”αŸ’αžšαžΆαž€αŸ‹αž’αŸ’αžœαžΎαžαžΆαž˜ ABA αž™αžΎαž„αž˜αž·αž“αžƒαžΎαž‰αž–αŸαžαŸŒαž˜αžΆαž“αž€αžΆαž αž¬αž‚αžŽαž“αžΈαž’αž“αžΆαž‚αžΆαžšαžšαž”αžŸαŸ‹αž’αŸ’αž“αž€αž‘αŸαŸ”

    The engineer

    Sidoeun Ly, Licensed PE (Cambodia), ACPE. 12+ years in civil, water resources and building works. M.Eng, INHA University, Korea. Signs every BOQ.

    Rates

    Every rate has a source and a date

    Rates come from Sidoku QS's Phnom Penh and provincial rate library. Each rate shows its source and the date it was checked. Rates older than 90 days are flagged EXPIRED and re-checked before use. Provincial jobs carry a transport factor.

    • SourceSupplier quote, invoice, labour build-up or a past project, named on the line.
    • Date checkedShown on every rate, so you can see how fresh it is.
    • 90-day limitOlder rates are flagged EXPIRED and re-checked before use.
    • Transport factorProvincial rate = Phnom Penh rate Γ— transport factor.
    Rate library Β· StructureIllustrative figures
    CodeItemUnitUS$SourceCheckedStatus
    C.03RC columns 300 Γ— 300mΒ³265.00Past project12 dOK
    C.04RC ground beams 250 Γ— 400mΒ³245.00Supplier quote47 dOK
    W.01Formwork to foundationsmΒ²9.80Labour build-up30 dOK
    R.01Rebar, cut, bent and fixedkg1.08Invoice96 dEXPIRED
    Phnom Penh rateΓ—transport factor=provincial rate
    Partner
    with us

    Partner with Sidoku QS and price every tender on engineer-checked numbers.

    Contractors, design consultants, owners and NGOs work with us job by job, or run their own takeoffs in the web app. Tell us about your next job and we come back with a fixed quote.

    Why partner with us

    • Free trainingYour team, trained on the app.
    • A scheduled callVideo or phone, at your time.
    • Construction OSEarly access as each module opens.
    • Rate updatesWhen supplier prices move.
    • One engineerA Licensed PE signs every BOQ.
    • Your name, your numberWhite label. NDA on request.