Draft takeoff
Select a region of the plan. Get the quantities behind it.
Every item shows its formula, measurement method, source drawing and assumption.
BOQ ααααΆααααα»α α£α αα·ααΆααΈα αααα½ααα·αα·αααααααα·ααααααααα»α α’ ααααααααΎααΆαα
Simple drawings get a draft BOQ in under 30 seconds in the web app. Full tender sets come back as a priced BOQ in Excel and PDF, checked by a Licensed PE (Cambodia), in 2 working days.
Draft in under 30 seconds Β· Checked in 2 working days Β· Excel + PDF Β· English and Khmer
Upload drawings, get a draft BOQ in minutes, every line traced to the drawing. Every line stays a draft until a reviewer approves it.
Free plan Β· Pro from $49 a month Β· Team from $129 a month
The same record starts at the inquiry and carries on through the job, the costs and the invoice, so the number a client accepts is the one the drawings produced.
No price yet Β· Waiting list only
Select a region of the plan. Get the quantities behind it.
Every item shows its formula, measurement method, source drawing and assumption.
Source and date on every rate; old rates flagged.
Filter by trade, source, approval and price date.
An estimator drafts; only a reviewer approves.
Approval is refused while a BOQ is empty, and every unapproved rate is named.
CSV, PDF, Excel and Word.
Every file is marked Draft BOQ: QS review required, and the totals reconcile to the cent.
Every module loads as you scroll, like the site office switching on at six in the morning.
Illustrative figures from the demonstration workspace Β· Try it: tap a task, a milestone or a project
1 follow-up overdue
Pending costs are shown, not counted, until someone approves them.
Upload drawings, get a draft BOQ in minutes, every line traced to the drawing. Every line stays a draft until a reviewer approves it.
Demonstration project Β· Scale 1:100
0 items found
Tap an item to see where it was measured.
Sidoku BOQ standard Β· same bill order every time
| Item | Description | Unit | Qty | Rate US$ | Amount US$ | Grade | Status |
|---|---|---|---|---|---|---|---|
| Draft total, excl. 10% VAT | |||||||
The rates this BOQ uses, each with its source and date
Rates older than 90 days are re-checked before use.
From drawing to a signed BOQ
0%reviewed
Illustrative figures from the demonstration workspace.
Published research, with the source on every card. Tap a card to see it.
US$ 15,000
lost on one bid, from quantity errors
That is 38% of your US$ 40,000 margin. The client does not pay for missed quantities. You do.
How Sidoku helps: every line is measured from the drawing and checked by a Licensed PE before you price it.
Source: Worked example
Illustrative arithmetic: 3% Γ US$500,000 = US$15,000, against an 8% margin of US$40,000. Your own tender and margin will differ.
0 in 10
megaprojects run over budget
Nine out of ten megaprojects run over budget. Overruns of up to 50% in real terms are common.
How Sidoku helps: a BOQ measured line by line from the drawings, before the price is fixed.
Source: Flyvbjerg, B. (2014), What You Should Know About Megaprojects and Why, Project Management Journal
Covers large projects worldwide, usually over US$1 billion.
0%
of projects came within 10% of budget
Only 31% of projects in the past three years finished within 10% of their budget.
How Sidoku helps: every rate shows its source and date; rates older than 90 days are re-checked.
Source: KPMG International, Global Construction Survey 2015 (reported by BD+C)
Survey of 109 senior leaders of organisations that build, worldwide.
0 in 4
projects finished within 10% of their deadline
Only a quarter of projects finished within 10% of their original deadline.
How Sidoku helps: a priced BOQ in 2 working days, so the estimate never holds up the bid.
Source: KPMG International, Global Construction Survey 2015 (reported by BD+C)
Same survey of 109 senior leaders.
0%
over budget, on large projects
Large projects typically take 20% longer than scheduled and can run up to 80% over budget.
How Sidoku helps: an RFI list of what the drawings do not show, before you commit to a number.
Source: McKinsey & Company (2016), Imagining construction's digital future
Large projects across asset classes, worldwide.
0%
of rework comes from poor data
Miscommunication and poor project data cause 48% of all rework on US jobsites.
How Sidoku helps: every quantity is linked to the drawing region it was measured from.
Source: FMI and PlanGrid (2018), Construction Disconnected
Survey of about 600 construction leaders in the US and other English-speaking countries.
0 hours
a week, per person, lost to rework and searching
Each project team member spends over 14 hours a week on conflict, rework and looking for project data.
How Sidoku helps: one record from drawing to BOQ, so nobody re-types or hunts for numbers.
Source: FMI and PlanGrid (2018), Construction Disconnected
Same survey. The 40-hour week in the bar is for scale.
Top 0
cause of cost overrun: inaccurate estimating
On high-rise projects in Indonesia, inaccurate material estimating was one of the three main causes of cost overrun.
How Sidoku helps: Checked and signed by a Licensed PE
Source: Kaming, P. et al. (1997), Construction Management and Economics 15(1)
Survey of project managers on high-rise projects in Jakarta and Yogyakarta.
0%
of poor cost performance traced to cost management
In Cambodian residential building projects, project and cost management explained 53% of the variance in poor cost performance.
How Sidoku helps: cost management that starts from a measured, priced BOQ.
Source: Durdyev, S. et al. (2017), Cogent Engineering 4(1)
Survey of contractors and project managers on residential building projects in Cambodia.
Price more tenders without more staff.
Add a BOQ to your design package, under your own name.
Know the fair price before you tender.
Every BOQ is checked by a Licensed PE (Cambodia). Fixed quote before work starts.
Also included: one round of corrections within 7 days of delivery.
Pay job by job. Quote before work starts.
Become our partnerIncludes
Contractors bidding a tender can choose a lower upfront fee plus % of the contract value if you win.
Try it on one small job a month.
Start freeIncludes
For owner-estimators pricing 2 to 3 tenders a month.
SubscribeEverything in Free, plus
For firms with 5 to 50 staff.
SubscribeEverything in Pro, plus
| What you get | Per BOQ | Free | Pro | Team |
|---|---|---|---|---|
| Your BOQ | ||||
| Priced BOQ in Excel and PDF | View only | |||
| Checked and signed by a Licensed PE | β | β | β | |
| Every quantity traced to the drawing | ||||
| Assumptions and confidence grade on every line | ||||
| RFI list of what the drawings do not show | β | β | β | |
| Cambodia rate library with source and date | Basic | |||
| Speed and help | ||||
| Turnaround | 2 working days | Instant draft | Instant draft | Instant draft |
| AI-assisted drawing reading | β | |||
| Corrections | 1 round within 7 days | β | β | β |
| Your team | ||||
| Credits a month | Quoted per job | 1 small job | 25 | 80 |
| Seats | β | 1 | 1 | 3, extra $25 a month |
| Approval workflow: estimators draft, reviewers approve | β | β | β | |
| Supplier and rate records | β | β | β | |
| Audit trail of every change | β | β | β | |
| Pay by ABA transfer or KHQR | β | |||
Sidoku QS does not bid tenders. Your drawings and prices stay with your reviewer. If our sister company is bidding the same tender, we decline the job, so your number is never seen by a competitor.
Sidoku QS αα·αα αΌααα½ααααααααααα ααααα αα·ααααααααααα’ααα ααααΌαααΆααααααΆαα»αααααΆαα½αα’ααααααα½ααα·αα·αααααα»αααααα ααααα·αααΎαααα»αα αα»αααααα’αΌαααααααΎα αααααααααααααααΌα ααααΆ ααΎαααΉαααα·αααααΆαααΆαααα ααΎααααΈαα»αα±αααααααααααα’αααααααΆαααα αααααααΌααααα½αααααααα
Your drawings stay with your reviewer and are deleted 90 days after delivery. Payment runs on ABA; we never see your card or bank details. NDA on request before you send anything.
αααααααααα’ααα ααααΌαααΆααααααΆαα»αααααΆαα½αα’ααααααα½ααα·αα·ααα α αΎααα»αα αααααααααΆααααααα α©α ααααα ααΆααααααααΆααααααΎααΆα ABA ααΎααα·αααΎαααααααΆαααΆα α¬ααααΈαααΆααΆαααααα’αααααα
Sidoeun Ly, Licensed PE (Cambodia), ACPE. 12+ years in civil, water resources and building works. M.Eng, INHA University, Korea. Signs every BOQ.
Rates come from Sidoku QS's Phnom Penh and provincial rate library. Each rate shows its source and the date it was checked. Rates older than 90 days are flagged EXPIRED and re-checked before use. Provincial jobs carry a transport factor.
Rate library last updated:
| Code | Item | Unit | US$ | Source | Checked | Status |
|---|---|---|---|---|---|---|
| C.03 | RC columns 300 Γ 300 | mΒ³ | 265.00 | Past project | 12 d | OK |
| C.04 | RC ground beams 250 Γ 400 | mΒ³ | 245.00 | Supplier quote | 47 d | OK |
| W.01 | Formwork to foundations | mΒ² | 9.80 | Labour build-up | 30 d | OK |
| R.01 | Rebar, cut, bent and fixed | kg | 1.08 | Invoice | 96 d | EXPIRED |
Contractors, design consultants, owners and NGOs work with us job by job, or run their own takeoffs in the web app. Tell us about your next job and we come back with a fixed quote.
Tell us what you are building and how to reach you. A quantity surveyor reads every request.